{"id":14733,"date":"2019-05-21T01:40:25","date_gmt":"2019-05-21T05:40:25","guid":{"rendered":"https:\/\/www.shorebeat.com\/brick\/?p=14733"},"modified":"2019-05-21T03:46:22","modified_gmt":"2019-05-21T07:46:22","slug":"brick-awards-contract-for-normandy-beach-outfall-pipe-replacement","status":"publish","type":"post","link":"https:\/\/shorebeat.com\/brick\/2019\/05\/brick-awards-contract-for-normandy-beach-outfall-pipe-replacement\/","title":{"rendered":"Brick Awards Contract for Normandy Beach Outfall Pipe Replacement"},"content":{"rendered":"<div id=\"attachment_14580\" style=\"width: 904px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2019\/04\/Screen-Shot-2019-04-12-at-2.44.35-AM.png\" data-rel=\"lightbox-image-0\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-14580\" class=\"size-full wp-image-14580\" src=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2019\/04\/Screen-Shot-2019-04-12-at-2.44.35-AM.png\" alt=\"Normandy Beach (Credit: Google Maps)\" width=\"894\" height=\"553\" srcset=\"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/04\/Screen-Shot-2019-04-12-at-2.44.35-AM.png 894w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/04\/Screen-Shot-2019-04-12-at-2.44.35-AM-400x247.png 400w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/04\/Screen-Shot-2019-04-12-at-2.44.35-AM-768x475.png 768w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/04\/Screen-Shot-2019-04-12-at-2.44.35-AM-679x420.png 679w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/04\/Screen-Shot-2019-04-12-at-2.44.35-AM-640x396.png 640w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/04\/Screen-Shot-2019-04-12-at-2.44.35-AM-681x421.png 681w\" sizes=\"auto, (max-width: 894px) 100vw, 894px\" \/><\/a><p id=\"caption-attachment-14580\" class=\"wp-caption-text\">Normandy Beach (Credit: Google Maps)<\/p><\/div>\n<p>Brick officials have awarded a contract to a firm that will replace a faltering outfall pipe in the township&#8217;s Normandy Beach section.<\/p>\n<p>The pipe, located near the playground adjacent to the Normandy Beach Improvement Association bay house, is failing. The replacement will be a 40 linear foot ductile pipe that will run into the bay from the Broad Avenue right-of-way, said Councilman Art Halloran.<\/p>\n<p>The pipe replacement will also help alleviate flooding in the neighborhood, according to officials. The contract, awarded last week, was characterized by wildly varied bid prices from potential contractors.<\/p>\n<p>Brick selected Albert Marine Construction of Waretown \u2013 a firm that frequently works on township and county projects \u2013 to perform the work for $15,369.<\/p>\n<p>The highest bid for the project was near eight times higher at $119,200.<\/p>\n<div class=\"fcbkbttn_buttons_block\" id=\"fcbkbttn_left\"><div class=\"fb-share-button fcbkbttn_large_button \" data-href=\"https:\/\/shorebeat.com\/brick\/2019\/05\/brick-awards-contract-for-normandy-beach-outfall-pipe-replacement\/\" data-type=\"button_count\" data-size=\"large\"><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Brick officials have awarded a contract to a firm that will replace a faltering outfall pipe in the township&#8217;s Normandy Beach section. The pipe, located near the playground adjacent to the Normandy Beach Improvement Association bay house, is failing. The replacement will be a 40 linear foot ductile pipe that will run into the bay [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14580,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[2],"tags":[77,24,28],"class_list":["post-14733","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-government","tag-barrier-island","tag-brick-nj-news","tag-normandy-beach"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/04\/Screen-Shot-2019-04-12-at-2.44.35-AM.png","jetpack_shortlink":"https:\/\/wp.me\/pgt2Ft-3PD","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts\/14733","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/comments?post=14733"}],"version-history":[{"count":0,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts\/14733\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/media\/14580"}],"wp:attachment":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/media?parent=14733"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/categories?post=14733"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/tags?post=14733"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}