{"id":15446,"date":"2019-10-16T03:46:14","date_gmt":"2019-10-16T07:46:14","guid":{"rendered":"https:\/\/www.shorebeat.com\/brick\/?p=15446"},"modified":"2019-10-16T03:49:57","modified_gmt":"2019-10-16T07:49:57","slug":"crews-begin-installation-of-new-dam-at-lake-riviera","status":"publish","type":"post","link":"https:\/\/shorebeat.com\/brick\/2019\/10\/crews-begin-installation-of-new-dam-at-lake-riviera\/","title":{"rendered":"Crews Begin Installation of New Dam at Lake Riviera"},"content":{"rendered":"<div id=\"attachment_15447\" style=\"width: 650px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_8219.jpg\" data-rel=\"lightbox-image-0\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-15447\" class=\"size-large wp-image-15447\" src=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_8219-1024x768.jpg\" alt=\"Work underway to replace the Lake Riviera dam in Brick, Oct. 2019. (Photo: Daniel Nee)\" width=\"640\" height=\"480\" srcset=\"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_8219-1024x768.jpg 1024w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_8219-240x180.jpg 240w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_8219-400x300.jpg 400w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_8219-768x576.jpg 768w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_8219-560x420.jpg 560w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_8219-80x60.jpg 80w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_8219-100x75.jpg 100w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_8219-180x135.jpg 180w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_8219-238x178.jpg 238w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_8219-640x480.jpg 640w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_8219-681x511.jpg 681w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><p id=\"caption-attachment-15447\" class=\"wp-caption-text\">Work underway to replace the Lake Riviera dam in Brick, Oct. 2019. (Photo: Daniel Nee)<\/p><\/div>\n<p>Construction crews began replacing the Lake Riviera dam on Tuesday, the day after the culvert pipe that makes up the bulk of the dam structure was delivered to Brick.<\/p>\n<p>The lake has been lowered to a maximum depth of 4-feet since June under orders from the state and cannot be raised to its normal level until the dam is replaced. The main component of the dam to be replaced, the culvert that carries water between Lake Riviera and the Rainbow Lake tributary, was manufactured in Pennsylvania and delivered to Brick this week.<\/p>\n<div id=\"attachment_15448\" style=\"width: 650px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_0602.jpg\" data-rel=\"lightbox-image-1\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-15448\" class=\"size-large wp-image-15448\" src=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_0602-1024x768.jpg\" alt=\"Work underway to replace the Lake Riviera dam in Brick, Oct. 2019. (Photo: Daniel Nee)\" width=\"640\" height=\"480\" srcset=\"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_0602-1024x768.jpg 1024w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_0602-240x180.jpg 240w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_0602-400x300.jpg 400w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_0602-768x576.jpg 768w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_0602-560x420.jpg 560w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_0602-80x60.jpg 80w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_0602-100x75.jpg 100w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_0602-180x135.jpg 180w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_0602-238x178.jpg 238w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_0602-640x480.jpg 640w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_0602-681x511.jpg 681w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><p id=\"caption-attachment-15448\" class=\"wp-caption-text\">Work underway to replace the Lake Riviera dam in Brick, Oct. 2019. (Photo: Daniel Nee)<\/p><\/div>\n<p>\u201cThey are on schedule for completing the cement culvert pipe,\u201d said Mayor John Ducey.<\/p>\n<p>Township Business Administrator Joanne Bergin said the lake level was lowered because the dam is considered a \u201cclass II\u201d structure and if it broke, property could be threatened by flooding.<\/p>\n<p>The scope of work \u2013 a $177,820 project \u2013 includes replacing the eroded section of the culvert with a 6-by-4 foot box culvert, replacing surface treatment filling in scoured areas, and implementing rip-rap sheeting for outlet protection at the Lake Riviera Park Area. The concrete culvert is in fabrication, which is expected to take about 5 weeks.<\/p>\n<p>The dam \u2013 which was working at the time \u2013 was replaced in 2012, also under order from the state, after a review of the state\u2019s dams dating back to Hurricane Floyd in 1999. The state was intent on eliminating \u201cearthened\u201d dams at the time. It has since failed, and the state has not contributed to its replacement.<\/p>\n<p>Ducey said the primary concern is getting the project completed and returning the lake to its normal level.<\/p>\n<p>\u201cWe need this to happen on schedule because the lake had to be drained by order of the state and it has been empty or close to empty for a while now,\u201d he said.<\/p>\n<div class=\"fcbkbttn_buttons_block\" id=\"fcbkbttn_left\"><div class=\"fb-share-button fcbkbttn_large_button \" data-href=\"https:\/\/shorebeat.com\/brick\/2019\/10\/crews-begin-installation-of-new-dam-at-lake-riviera\/\" data-type=\"button_count\" data-size=\"large\"><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Construction crews began replacing the Lake Riviera dam on Tuesday, the day after the culvert pipe that makes up the bulk of the dam structure was delivered to Brick. The lake has been lowered to a maximum depth of 4-feet since June under orders from the state and cannot be raised to its normal level [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":15447,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[2],"tags":[24,3689,1273],"class_list":["post-15446","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-government","tag-brick-nj-news","tag-dam","tag-lake-riviera"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2019\/10\/IMG_8219.jpg","jetpack_shortlink":"https:\/\/wp.me\/pgt2Ft-418","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts\/15446","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/comments?post=15446"}],"version-history":[{"count":0,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts\/15446\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/media\/15447"}],"wp:attachment":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/media?parent=15446"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/categories?post=15446"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/tags?post=15446"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}