{"id":18588,"date":"2021-09-09T05:15:06","date_gmt":"2021-09-09T09:15:06","guid":{"rendered":"https:\/\/www.shorebeat.com\/brick\/?p=18588"},"modified":"2021-09-09T05:15:06","modified_gmt":"2021-09-09T09:15:06","slug":"another-warehouse-apartment-combo-development-proposed-for-drum-point-road","status":"publish","type":"post","link":"https:\/\/shorebeat.com\/brick\/2021\/09\/another-warehouse-apartment-combo-development-proposed-for-drum-point-road\/","title":{"rendered":"Another Warehouse-Apartment Combo Development Proposed for Drum Point Road"},"content":{"rendered":"<div id=\"attachment_18590\" style=\"width: 1010px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_052-scaled.jpg\" data-rel=\"lightbox-image-0\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-18590\" class=\"size-large wp-image-18590\" src=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_052-1024x683.jpg\" alt=\"The property at 251 Drum Point Road, the subject of a proposal for a pole barn and residential complex. (Photo: Daniel Nee)\" width=\"1000\" height=\"667\" srcset=\"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_052-1024x683.jpg 1024w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_052-400x267.jpg 400w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_052-768x512.jpg 768w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_052-1536x1024.jpg 1536w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_052-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-18590\" class=\"wp-caption-text\">The property at 251 Drum Point Road, the subject of a proposal for a pole barn and residential complex. (Photo: Daniel Nee)<\/p><\/div>\n<p>In the same week an application was filed with Brick officials to <a href=\"https:\/\/www.shorebeat.com\/brick\/2021\/09\/developer-proposes-scaled-back-work-space-apartment-complex-off-drum-point-following-denial\/\">revive the idea<\/a> for a mixed-use project including workspace for those in the building trades and apartments on Drum Point Road, an unrelated-but-similar proposal was made on another portion of the same main thoroughfare.<\/p>\n<p><span id=\"ctl00_ContentPlaceHolder1_PublicNoticeDetailsBody1_lblContentText\">According to planning board filings, Kenneth Beck<\/span>, the owner of the property at 251 Drum Point Road, is proposing the construction of a 5,000 square foot pole barn (contractor shop) with a gravel parking area, and a 2,500 square foot, two-story combination residential and commercial building with garage.<\/p>\n<div id=\"attachment_18589\" style=\"width: 1010px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_051-scaled.jpg\" data-rel=\"lightbox-image-1\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-18589\" class=\"size-large wp-image-18589\" src=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_051-1024x683.jpg\" alt=\"The property at 251 Drum Point Road, the subject of a proposal for a pole barn and residential complex. (Photo: Daniel Nee)\" width=\"1000\" height=\"667\" srcset=\"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_051-1024x683.jpg 1024w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_051-400x267.jpg 400w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_051-768x512.jpg 768w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_051-1536x1024.jpg 1536w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_051-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-18589\" class=\"wp-caption-text\">The property at 251 Drum Point Road, the subject of a proposal for a pole barn and residential complex. (Photo: Daniel Nee)<\/p><\/div>\n<p>A \u201cpole barn\u201d is a building with what is known as post-frame construction. It uses large poles or posts buried in the ground or on a foundation to provide the vertical structural support, along with girts to provide horizontal support. The building style became popular in agriculture over the last century, as farming began to require large, covered storage areas for industrial equipment. The same construction concept can be used for buildings with non-agricultural uses.<\/p>\n<p>The property in question, 251 Drum Point Road, is partially-undeveloped and partially developed with an aging residential home that appears to be unoccupied.<\/p>\n<div id=\"attachment_18591\" style=\"width: 1010px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_053-scaled.jpg\" data-rel=\"lightbox-image-2\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-18591\" class=\"size-large wp-image-18591\" src=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_053-1024x683.jpg\" alt=\"The property at 251 Drum Point Road, the subject of a proposal for a pole barn and residential complex. (Photo: Daniel Nee)\" width=\"1000\" height=\"667\" srcset=\"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_053-1024x683.jpg 1024w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_053-400x267.jpg 400w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_053-768x512.jpg 768w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_053-1536x1024.jpg 1536w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_053-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-18591\" class=\"wp-caption-text\">The property at 251 Drum Point Road, the subject of a proposal for a pole barn and residential complex. (Photo: Daniel Nee)<\/p><\/div>\n<p>The project requires variance relief from the township\u2019s planning board due to parking constraints; the r<span id=\"ctl00_ContentPlaceHolder1_PublicNoticeDetailsBody1_lblContentText\">equired minimum number of parking spaces is 43 spaces, whereas 13 are proposed. Two of the spaces will fall below the minimum 10-foot stall width requirement.<\/span><\/p>\n<p>A hearing on the proposal will be held Sept. 22 at 7 p.m. at the township municipal complex on Chambers Bridge Road.<\/p>\n<div class=\"fcbkbttn_buttons_block\" id=\"fcbkbttn_left\"><div class=\"fb-share-button fcbkbttn_large_button \" data-href=\"https:\/\/shorebeat.com\/brick\/2021\/09\/another-warehouse-apartment-combo-development-proposed-for-drum-point-road\/\" data-type=\"button_count\" data-size=\"large\"><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>In the same week an application was filed with Brick officials to revive the idea for a mixed-use project including workspace for those in the building trades and apartments on Drum Point Road, an unrelated-but-similar proposal was made on another portion of the same main thoroughfare. According to planning board filings, Kenneth Beck, the owner [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":18590,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[2,1649],"tags":[4487,24,4484,2748,4488,4489],"class_list":["post-18588","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-government","category-local-business","tag-251-drum-point-road","tag-brick-nj-news","tag-featured","tag-mixed-use-development","tag-pole-barn","tag-warehouse"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2021\/09\/drum_point_proposal_mixed_use_pole_barn_apartments_052-scaled.jpg","jetpack_shortlink":"https:\/\/wp.me\/pgt2Ft-4PO","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts\/18588","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/comments?post=18588"}],"version-history":[{"count":0,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts\/18588\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/media\/18590"}],"wp:attachment":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/media?parent=18588"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/categories?post=18588"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/tags?post=18588"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}