{"id":19738,"date":"2022-03-29T03:06:37","date_gmt":"2022-03-29T07:06:37","guid":{"rendered":"https:\/\/www.shorebeat.com\/brick\/?p=19738"},"modified":"2022-03-29T03:06:51","modified_gmt":"2022-03-29T07:06:51","slug":"brick-sets-standards-for-5g-small-cell-nodes-heres-what-theyll-look-like","status":"publish","type":"post","link":"https:\/\/shorebeat.com\/brick\/2022\/03\/brick-sets-standards-for-5g-small-cell-nodes-heres-what-theyll-look-like\/","title":{"rendered":"Brick Sets Standards for 5G &#8216;Small Cell&#8217; Nodes: Here&#8217;s What They&#8217;ll Look Like"},"content":{"rendered":"<div id=\"attachment_19743\" style=\"width: 1010px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_355-scaled.jpg\" data-rel=\"lightbox-image-0\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-19743\" class=\"size-large wp-image-19743\" src=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_355-1024x569.jpg\" alt=\"5G network infrastructure along Route 35 in Ocean County, N.J. (Photo: Daniel Nee)\" width=\"1000\" height=\"556\" srcset=\"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_355-1024x569.jpg 1024w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_355-400x222.jpg 400w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_355-768x427.jpg 768w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_355-1536x853.jpg 1536w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_355-2048x1138.jpg 2048w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-19743\" class=\"wp-caption-text\">5G network infrastructure along Route 35 in Ocean County, N.J. (Photo: Daniel Nee)<\/p><\/div>\n<p>Brick Township officials introduced an ordinance regulating the placement of 5G mobile network nodes in the township. Commonly known as \u201csmall cells,\u201d the nodes are wireless antennas that are placed closer to the street-level \u2013 usually on utility poles or street lights \u2013 instead of on tall towers.<\/p>\n<p>Municipal governments have little room to regulate 5G network infrastructure. The Federal Communications Commission has enacted a set of rules that greatly restrict local governments, and even state governments, from creating policies that overly regulate or prohibit the next-generation technology. Brick, like several towns statewide, is taking a limited regulatory approach from a land use perspective. The ordinance regulates the siting of \u201csmall cell facilities and wireless poles\u201d in the public right-of-way.<\/p>\n<div id=\"attachment_19742\" style=\"width: 1010px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_354-scaled.jpg\" data-rel=\"lightbox-image-1\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-19742\" class=\"size-large wp-image-19742\" src=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_354-1024x579.jpg\" alt=\"5G network infrastructure along Route 35 in Ocean County, N.J. (Photo: Daniel Nee)\" width=\"1000\" height=\"565\" srcset=\"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_354-1024x579.jpg 1024w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_354-400x226.jpg 400w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_354-768x434.jpg 768w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_354-1536x869.jpg 1536w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_354-2048x1158.jpg 2048w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-19742\" class=\"wp-caption-text\">5G network infrastructure along Route 35 in Ocean County, N.J. (Photo: Daniel Nee)<\/p><\/div>\n<div id=\"attachment_19740\" style=\"width: 1010px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_352-scaled.jpg\" data-rel=\"lightbox-image-2\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-19740\" class=\"size-large wp-image-19740\" src=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_352-1024x569.jpg\" alt=\"5G network infrastructure along Route 35 in Ocean County, N.J. (Photo: Daniel Nee)\" width=\"1000\" height=\"556\" srcset=\"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_352-1024x569.jpg 1024w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_352-400x222.jpg 400w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_352-768x427.jpg 768w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_352-1536x853.jpg 1536w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_352-2048x1138.jpg 2048w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-19740\" class=\"wp-caption-text\">5G network infrastructure along Route 35 in Ocean County, N.J. (Photo: Daniel Nee)<\/p><\/div>\n<p>Brick\u2019s proposed ordinance is aimed at establishing a single 5G node policy for the township, conserving space in the right-of-way, ensuring that equipment complies with laws and regulations, and protecting safety.<\/p>\n<p>\u201cIt was researched by the township\u2019s telecommunications expert,\u201d said Councilman Art Halloran. \u201cThe ordinance gives the township the ability to have some say in the 5G technology that is coming into municipalities across the state.\u201d<\/p>\n<p>Halloran said the township\u2019s ordinance only applies to the public right-of-way. If a 5G node is to be sited on private property, it would require a site plan to be submitted to the township for review, and depending on the zone and design of the proposal, a hearing before the zoning board could be required.<\/p>\n<p>\u201cWe cannot stop the technology,\u201d said Halloran. \u201cThe only actions municipalities can do is regulate the equipment. This ordinance allows the township to drive the aesthetics.\u201d<\/p>\n<p>The ordinance is lengthy and spans 10 pages. A full text appears embedded in PDF format below.<\/p>\n<p>Some of the highlights of the ordinance for 5G nodes include:<\/p>\n<ul>\n<li>A master license agreement is required.<\/li>\n<li>Small cell nodes cannot extend more than six feet from the top of the utility pole on which they are placed.<\/li>\n<li>Nodes must utilize \u201cstealth technology methods\u201d to \u201ccamouflage\u201d the appearance of the housing \u201cso as to blend in compatibly with its background and so as to minimize the visual impact in surrounding properties.<\/li>\n<li>Engineer certificate is required.<\/li>\n<li>Equipment cabinets must not project more than 30 inches from a pole. The equipment may not exceed seven feet in height, except in flood zones.<\/li>\n<li>The cumulative size of small cell arrays \u2013 both the node and equipment box \u2013 may not exceed 20 cubic feet.<\/li>\n<\/ul>\n<p>New poles are generally no longer allowed in Brick neighborhoods where utilities are located underground. In these neighborhoods, a wireless provider seeking to install 5G equipment would likely be required to apply for a variance from the zoning board. If a pole is to be built, it is prohibited from being constructed more than 15 percent higher than other poles within 500-feet, and a total maximum of 30-feet is set. Any departure from the height requirements would require a hearing before the board.<\/p>\n<div id=\"attachment_19744\" style=\"width: 1010px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_356-scaled.jpg\" data-rel=\"lightbox-image-3\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-19744\" class=\"size-large wp-image-19744\" src=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_356-1024x576.jpg\" alt=\"5G network infrastructure along Route 35 in Ocean County, N.J. (Photo: Daniel Nee)\" width=\"1000\" height=\"563\" srcset=\"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_356-1024x576.jpg 1024w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_356-400x225.jpg 400w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_356-768x432.jpg 768w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_356-1536x864.jpg 1536w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_356-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-19744\" class=\"wp-caption-text\">5G network infrastructure along Route 35 in Ocean County, N.J. (Photo: Daniel Nee)<\/p><\/div>\n<div id=\"attachment_19740\" style=\"width: 1010px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_352-scaled.jpg\" data-rel=\"lightbox-image-2\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-19740\" class=\"size-large wp-image-19740\" src=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_352-1024x569.jpg\" alt=\"5G network infrastructure along Route 35 in Ocean County, N.J. (Photo: Daniel Nee)\" width=\"1000\" height=\"556\" srcset=\"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_352-1024x569.jpg 1024w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_352-400x222.jpg 400w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_352-768x427.jpg 768w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_352-1536x853.jpg 1536w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_352-2048x1138.jpg 2048w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-19740\" class=\"wp-caption-text\">5G network infrastructure along Route 35 in Ocean County, N.J. (Photo: Daniel Nee)<\/p><\/div>\n<p>Brick also added a co-location clause to the ordinance, which requires wireless providers to make an attempt to locate their equipment on existing poles where other providers have sited their own nodes. Providers would also pay a $500 application fee and place $5,000 into an escrow account while the township reviews the application.<\/p>\n<p>A public hearing and second vote on the ordinance for final passage has been set for the April 12 township council meeting.<\/p>\n<p><strong>Read the Ordinance:<\/strong><\/p>\n<iframe loading=\"lazy\" class=\"scribd_iframe_embed\" src=\"https:\/\/www.scribd.com\/embeds\/567061973\/content?start_page=1&view_mode&access_key=key-SokeD2eZiNANXTEd8f29\"  data-auto-height=\"true\" scrolling=\"no\" id=\"scribd_567061973\" width=\"100%\" height=\"500\" frameborder=\"0\"><\/iframe>\n\t\t<div style=\"font-size:10px;text-align:center;width:100%\"><a href=\"https:\/\/www.scribd.com\/doc\/567061973\" rel=\"noopener noreferrer\" target=\"_blank\">View this document on Scribd<\/a><\/div>\n<div class=\"fcbkbttn_buttons_block\" id=\"fcbkbttn_left\"><div class=\"fb-share-button fcbkbttn_large_button \" data-href=\"https:\/\/shorebeat.com\/brick\/2022\/03\/brick-sets-standards-for-5g-small-cell-nodes-heres-what-theyll-look-like\/\" data-type=\"button_count\" data-size=\"large\"><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Brick Township officials introduced an ordinance regulating the placement of 5G mobile network nodes in the township. Commonly known as \u201csmall cells,\u201d the nodes are wireless antennas that are placed closer to the street-level \u2013 usually on utility poles or street lights \u2013 instead of on tall towers. Municipal governments have little room to regulate [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":19743,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[2],"tags":[3817,24,4484,4626,3818],"class_list":["post-19738","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-government","tag-5g","tag-brick-nj-news","tag-featured","tag-node","tag-small-cell"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/03\/5g_small_cell_node_antenna_tower_355-scaled.jpg","jetpack_shortlink":"https:\/\/wp.me\/pgt2Ft-58m","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts\/19738","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/comments?post=19738"}],"version-history":[{"count":0,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts\/19738\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/media\/19743"}],"wp:attachment":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/media?parent=19738"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/categories?post=19738"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/tags?post=19738"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}