{"id":21089,"date":"2022-11-17T04:04:15","date_gmt":"2022-11-17T09:04:15","guid":{"rendered":"https:\/\/www.shorebeat.com\/brick\/?p=21089"},"modified":"2022-11-17T04:04:35","modified_gmt":"2022-11-17T09:04:35","slug":"brick-adopts-electric-vehicle-parking-requirements-for-new-construction","status":"publish","type":"post","link":"https:\/\/shorebeat.com\/brick\/2022\/11\/brick-adopts-electric-vehicle-parking-requirements-for-new-construction\/","title":{"rendered":"Brick Adopts Electric Vehicle Parking, Charging Requirements for New Construction"},"content":{"rendered":"<div id=\"attachment_21090\" style=\"width: 1010px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2022\/11\/multi-charging-stations.jpg\" data-rel=\"lightbox-image-0\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-21090\" class=\"size-full wp-image-21090\" src=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2022\/11\/multi-charging-stations.jpg\" alt=\"A multi-charging EV station. (Credit: NJDEP)\" width=\"1000\" height=\"667\" srcset=\"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/11\/multi-charging-stations.jpg 1000w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/11\/multi-charging-stations-400x267.jpg 400w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/11\/multi-charging-stations-768x512.jpg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-21090\" class=\"wp-caption-text\">A multi-charging EV station. (Credit: NJDEP)<\/p><\/div>\n<p>Brick Township has adopted an ordinance setting forth electric vehicle charging and parking requirements for new construction, largely to fulfill state land use code requirements as a result of several new statutes and an executive order issued by Gov. Phil Murphy.<\/p>\n<p>The ordinance, adopted last week, follows state-mandated language. It requires either the installation of electric vehicle charging stations, or parking spaces with pre-wiring for future charging technology, in several commercial and multifamily housing zones. It also allows the inclusion of charging stations of pre-wiring (known as a \u201cmake-ready\u201d space) as a permitted accessory use in all zones.<\/p>\n<p>Newly-built single-family homes will not be required to include the chargers or make-ready spaces, however residential properties with five or more dwelling units \u2013 including condominiums and co-ops \u2013 will be mandated to include pre-wiring in at least 15 percent of proposed off-street parking spaces. Of that 15 percent, one-third will be required to include a full charging system, including cables, connectors and switching equipment. The requirements will also apply to mixed-use properties.<\/p>\n<p>Additionally, properties in all other zones, such as commercial, industrial or medical zones, will be required to provide at least one make-ready space if there are 50 parking stalls or fewer, two spaces for 51-75 stalls, three spaces for 76-100 stalls and four spaces for 101-150 stalls. In cases where there are more than 150 spaces required or proposed, 4 percent of the spaces must be set aside as \u201cmake-ready\u201d with pre-wiring. Of those spaces, 5 percent must be additionally set aside as EV handicap spaces. Property owners can also choose to install working EV charging stations in lieu of the \u201cmake-ready\u201d spaces with paid chargers.<\/p>\n<p>The spaces must be accompanied with regulatory signage, time limits, tow-away provisions, fees and a contact number for drivers to report outages.<\/p>\n<p>Businesses with 25 or fewer spaces, as well as single-family homes, are not obligated to provide any EV spaces.<\/p>\n<p><strong>A full copy of the ordinance, as adopted, is embedded below:<\/strong><\/p>\n<iframe loading=\"lazy\" class=\"scribd_iframe_embed\" src=\"https:\/\/www.scribd.com\/embeds\/608247984\/content?start_page=1&view_mode&access_key=key-u9d9rLUL5enfwYre4qws\"  data-auto-height=\"true\" scrolling=\"no\" id=\"scribd_608247984\" width=\"100%\" height=\"500\" frameborder=\"0\"><\/iframe>\n\t\t<div style=\"font-size:10px;text-align:center;width:100%\"><a href=\"https:\/\/www.scribd.com\/doc\/608247984\" rel=\"noopener noreferrer\" target=\"_blank\">View this document on Scribd<\/a><\/div>\n<div class=\"fcbkbttn_buttons_block\" id=\"fcbkbttn_left\"><div class=\"fb-share-button fcbkbttn_large_button \" data-href=\"https:\/\/shorebeat.com\/brick\/2022\/11\/brick-adopts-electric-vehicle-parking-requirements-for-new-construction\/\" data-type=\"button_count\" data-size=\"large\"><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Brick Township has adopted an ordinance setting forth electric vehicle charging and parking requirements for new construction, largely to fulfill state land use code requirements as a result of several new statutes and an executive order issued by Gov. Phil Murphy. The ordinance, adopted last week, follows state-mandated language. It requires either the installation of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":21090,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[2],"tags":[24,4785,4484],"class_list":["post-21089","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-government","tag-brick-nj-news","tag-ev-charging-station","tag-featured"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2022\/11\/multi-charging-stations.jpg","jetpack_shortlink":"https:\/\/wp.me\/pgt2Ft-5u9","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts\/21089","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/comments?post=21089"}],"version-history":[{"count":0,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts\/21089\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/media\/21090"}],"wp:attachment":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/media?parent=21089"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/categories?post=21089"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/tags?post=21089"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}