{"id":26169,"date":"2026-05-14T14:38:55","date_gmt":"2026-05-14T18:38:55","guid":{"rendered":"https:\/\/shorebeat.com\/brick\/?p=26169"},"modified":"2026-05-14T14:40:28","modified_gmt":"2026-05-14T18:40:28","slug":"brick-wawa-location-poised-to-receive-upgrades-ev-chargers","status":"publish","type":"post","link":"https:\/\/shorebeat.com\/brick\/2026\/05\/brick-wawa-location-poised-to-receive-upgrades-ev-chargers\/","title":{"rendered":"Brick Wawa Location Poised to Receive Upgrades, EV Chargers"},"content":{"rendered":"<div id=\"attachment_26170\" style=\"width: 1010px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2026\/05\/wawa_brick.jpg\" data-rel=\"lightbox-image-0\" data-rl_title=\"The Wawa location at 383 Drum Point Road. (Google Earth)\" data-rl_caption=\"\" title=\"The Wawa location at 383 Drum Point Road. (Google Earth)\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-26170\" class=\"size-large wp-image-26170\" src=\"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2026\/05\/wawa_brick-1024x644.jpg\" alt=\"The Wawa location at 383 Drum Point Road. (Google Earth)\" width=\"1000\" height=\"629\" srcset=\"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2026\/05\/wawa_brick-1024x644.jpg 1024w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2026\/05\/wawa_brick-400x252.jpg 400w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2026\/05\/wawa_brick-768x483.jpg 768w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2026\/05\/wawa_brick-1536x967.jpg 1536w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2026\/05\/wawa_brick.jpg 1581w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-26170\" class=\"wp-caption-text\">The Wawa location at 383 Drum Point Road. (Google Earth)<\/p><\/div>\n<p>One of Brick Township\u2019s Wawa locations is planning to update the exterior of the building and add EV chargers to the parking lot.<\/p>\n<p>According to a filing with the township\u2019s planning board, the changes are being proposed for the Wawa location at 383 Drum Point Road. The company is proposing to install a canopy, four electric vehicle charging stations that will support eight EV charging parking spaces, along with an electric transformer and power distribution equipment. The addition of the EV spaces will come alongside related site improvements to the outdoor of the business, including lighting, landscaping, and signage at the existing Wawa.<\/p>\n<p>The property is located in the township\u2019s village zone. The planning board will hear details and vote on its approval at the May 27, 2026 board meeting, which will be held at 7 p.m. at the township municipal complex.<\/p>\n<div class=\"fcbkbttn_buttons_block\" id=\"fcbkbttn_left\"><div class=\"fb-share-button fcbkbttn_large_button \" data-href=\"https:\/\/shorebeat.com\/brick\/2026\/05\/brick-wawa-location-poised-to-receive-upgrades-ev-chargers\/\" data-type=\"button_count\" data-size=\"large\"><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>One of Brick Township\u2019s Wawa locations is planning to update the exterior of the building and add EV chargers to the parking lot. According to a filing with the township\u2019s planning board, the changes are being proposed for the Wawa location at 383 Drum Point Road. The company is proposing to install a canopy, four [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":26170,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[2,1649],"tags":[24,4785,4484,272],"class_list":["post-26169","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-government","category-local-business","tag-brick-nj-news","tag-ev-charging-station","tag-featured","tag-wawa"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2026\/05\/wawa_brick.jpg","jetpack_shortlink":"https:\/\/wp.me\/pgt2Ft-6O5","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts\/26169","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/comments?post=26169"}],"version-history":[{"count":2,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts\/26169\/revisions"}],"predecessor-version":[{"id":26172,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts\/26169\/revisions\/26172"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/media\/26170"}],"wp:attachment":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/media?parent=26169"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/categories?post=26169"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/tags?post=26169"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}