{"id":9608,"date":"2016-10-26T18:31:31","date_gmt":"2016-10-26T22:31:31","guid":{"rendered":"https:\/\/www.shorebeat.com\/brick\/?p=9608"},"modified":"2016-10-26T19:29:02","modified_gmt":"2016-10-26T23:29:02","slug":"construction-on-brick-parkway-interchange-91-will-resume-this-week-last-into-spring","status":"publish","type":"post","link":"https:\/\/shorebeat.com\/brick\/2016\/10\/construction-on-brick-parkway-interchange-91-will-resume-this-week-last-into-spring\/","title":{"rendered":"Construction on Brick Parkway Interchange 91 Will Resume This Week, Last Into Spring"},"content":{"rendered":"<div id=\"attachment_9609\" style=\"width: 628px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2016\/10\/exit_91_parkway_interchange_brick13.jpg\" data-rel=\"lightbox-image-0\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-9609\" class=\"size-large wp-image-9609\" src=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2016\/10\/exit_91_parkway_interchange_brick13-1024x798.jpg\" alt=\"Construction at interchange 91 of the Garden State Parkway in Brick, Oct. 26, 2016. (Photo: Daniel Nee)\" width=\"618\" height=\"482\" srcset=\"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2016\/10\/exit_91_parkway_interchange_brick13-1024x798.jpg 1024w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2016\/10\/exit_91_parkway_interchange_brick13-400x312.jpg 400w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2016\/10\/exit_91_parkway_interchange_brick13-768x599.jpg 768w\" sizes=\"auto, (max-width: 618px) 100vw, 618px\" \/><\/a><p id=\"caption-attachment-9609\" class=\"wp-caption-text\">Construction at interchange 91 of the Garden State Parkway in Brick, Oct. 26, 2016. (Photo: Daniel Nee)<\/p><\/div>Construction on the major realignment of Garden State Park interchange 91 in Brick and the roads surrounding are expected to resume this week and last into the spring, officials said Wednesday.<\/p>\n<p>Construction on the project, which will create entrances and exits to the northbound and southbound lanes of the highway \u2013 and realign many of the roads around it with the aim of helping traffic flow \u2013 has been delayed since the summer, when Gov. Chris Christie halted state-funded projects after a proposed increase to the state\u2019s gas tax failed. Recently, the <a href=\"https:\/\/www.shorebeat.com\/brick\/2016\/10\/opinion-for-many-n-j-residents-gas-tax-hike-will-be-a-final-nail-in-the-coffin\/\">tax hike passed<\/a> the legislature and was signed into law, paving the way for construction to restart.<\/p>\n<p>The project, though partially funded by the state, is being led by Ocean County, since the roads surrounding the interchange are under county jurisdiction. County Engineer John Ernst said at a meeting of the Ocean County Freeholders on Wednesday that crews began\u00a0canvassing the site on Monday in preparation for construction to restart.<\/p>\n<p>\u201cWe met with the contractor last week and he started mobilizing on Monday,\u201d said Ernst. \u201cWe have our inspectors back out there working with them.\u201d<\/p>\n<div id=\"attachment_9610\" style=\"width: 628px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2016\/10\/exit_91_parkway_interchange_brick12.jpg\" data-rel=\"lightbox-image-1\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-9610\" class=\"size-large wp-image-9610\" src=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2016\/10\/exit_91_parkway_interchange_brick12-1024x681.jpg\" alt=\"Construction at interchange 91 of the Garden State Parkway in Brick, Oct. 26, 2016. (Photo: Daniel Nee)\" width=\"618\" height=\"411\" srcset=\"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2016\/10\/exit_91_parkway_interchange_brick12-1024x681.jpg 1024w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2016\/10\/exit_91_parkway_interchange_brick12-400x266.jpg 400w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2016\/10\/exit_91_parkway_interchange_brick12-768x511.jpg 768w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2016\/10\/exit_91_parkway_interchange_brick12-310x205.jpg 310w\" sizes=\"auto, (max-width: 618px) 100vw, 618px\" \/><\/a><p id=\"caption-attachment-9610\" class=\"wp-caption-text\">Construction at interchange 91 of the Garden State Parkway in Brick, Oct. 26, 2016. (Photo: Daniel Nee)<\/p><\/div>Ernst said the project was about two-thirds complete when Christie ordered the project to stop. Though construction crews will begin working this week to complete the job, asphalt plants do not operate during the colder months, so the final paving will have to wait until the spring.<\/p>\n<p>\u201cThe original contract was supposed to be done in February, so now we\u2019re looking at March, April or May,\u201d said Ernst, adding that the contractor had \u2013 before the stoppage \u2013 forecasted that work could have been completed by mid-November. \u201cWhen the project stopped, the contractor was trying to expedite the project and he was trying to get it done in the fall.\u201d<\/p>\n<p>When the project came to a stop, the Brick Township Municipal Utilities Authority was in the midst of removing old sewer lines and replacing them with new lines. That work also had to come to a stop and now must resume, Ernst said.<\/p>\n<p>\u201cThere\u2019s a lot of work to go that you\u2019re not seeing because it\u2019s under the pavement,\u201d he said.<\/p>\n<p>Ernst said he estimates the construction will be completed between March and May.<\/p>\n[box type=\u201dshadow\u201d align=\u201d\u201d class=\u201d\u201d width=\u201d\u201d]<strong>More on the Project<\/strong><\/p>\n<p>The photo below mapping out the changes will expand when clicked. The project will include:<\/p>\n<p><strong>\u2013<\/strong>\u00a0A new northbound entrance ramp from Burnt Tavern Road and Lanes Mill Road, with access to the park-and-ride lot on the east side of the Parkway.<br \/>\n<strong>\u2013<\/strong>\u00a0A second northbound entrance ramp for vehicles traveling eastbound on Burnt Tavern Road. This ramp will allow access from Burrsville Road. The single existing northbound ramp will be eliminated.<br \/>\n<strong>\u2013<\/strong>\u00a0New northbound exit and entrance ramps linking the Parkway and Burrsville Road.<br \/>\n<strong>\u2013<\/strong>\u00a0A new southbound entrance ramp for traffic heading west on Burnt Tavern Road.<br \/>\n<strong>\u2013<\/strong>\u00a0A second southbound entrance ramp linking Lanes Mill Road with the Parkway. Herborn Avenue will be extended south and east to Lanes Mill Road, where it will meet the new entrance ramp and a signaled intersection.[\/box]\n<div id=\"attachment_1235\" style=\"width: 628px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2014\/09\/Interchange91.jpg\" data-rel=\"lightbox-image-2\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-1235\" class=\"size-large wp-image-1235\" src=\"https:\/\/www.shorebeat.com\/brick\/wp-content\/uploads\/2014\/09\/Interchange91-1024x616.jpg\" alt=\"Ocean County's plan for Parkway Interchange 91 in Brick. (Photo: Ocean County Department of Engineering)\" width=\"618\" height=\"372\" srcset=\"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2014\/09\/Interchange91-1024x616.jpg 1024w, https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2014\/09\/Interchange91-400x240.jpg 400w\" sizes=\"auto, (max-width: 618px) 100vw, 618px\" \/><\/a><p id=\"caption-attachment-1235\" class=\"wp-caption-text\">Ocean County\u2019s plan for Parkway Interchange 91 in Brick. (Photo: Ocean County Department of Engineering)<\/p><\/div>\n<div class=\"fcbkbttn_buttons_block\" id=\"fcbkbttn_left\"><div class=\"fb-share-button fcbkbttn_large_button \" data-href=\"https:\/\/shorebeat.com\/brick\/2016\/10\/construction-on-brick-parkway-interchange-91-will-resume-this-week-last-into-spring\/\" data-type=\"button_count\" data-size=\"large\"><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Construction on the major realignment of Garden State Park interchange 91 in Brick and the roads surrounding are expected to resume this week and last into the spring, officials said Wednesday. Construction on the project, which will create entrances and exits to the northbound and southbound lanes of the highway \u2013 and realign many of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9609,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":true,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[2],"tags":[24,1369,808,350,171,2292],"class_list":["post-9608","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-government","tag-brick-nj-news","tag-chris-christie","tag-construction","tag-exit-91","tag-interchange-91","tag-transportation-trust-fund"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/shorebeat.com\/brick\/wp-content\/uploads\/2016\/10\/exit_91_parkway_interchange_brick13.jpg","jetpack_shortlink":"https:\/\/wp.me\/pgt2Ft-2uY","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts\/9608","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/comments?post=9608"}],"version-history":[{"count":0,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/posts\/9608\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/media\/9609"}],"wp:attachment":[{"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/media?parent=9608"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/categories?post=9608"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shorebeat.com\/brick\/wp-json\/wp\/v2\/tags?post=9608"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}