{"id":10822,"date":"2022-03-04T18:29:09","date_gmt":"2022-03-04T23:29:09","guid":{"rendered":"https:\/\/shorebeat.com\/lavallette-seaside\/?p=10822"},"modified":"2022-03-04T18:33:11","modified_gmt":"2022-03-04T23:33:11","slug":"verizon-begins-deploying-its-5g-nodes-in-lavallette","status":"publish","type":"post","link":"https:\/\/shorebeat.com\/lavallette-seaside\/2022\/03\/verizon-begins-deploying-its-5g-nodes-in-lavallette\/","title":{"rendered":"Verizon Begins Deploying Its 5G Nodes in Lavallette"},"content":{"rendered":"<div id=\"attachment_10825\" style=\"width: 1010px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553917_DJI_317_jpg_1117186_0_202233154344_photo_original.jpg.jpg\" data-rel=\"lightbox-image-0\" data-rl_title=\"\" data-rl_caption=\"A small cell 5G node installed along Route 35 in Lavallette, March 2022. (Photo: Daniel Nee)\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-10825\" class=\"size-large wp-image-10825\" src=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553917_DJI_317_jpg_1117186_0_202233154344_photo_original.jpg-1024x763.jpg\" alt=\"A small cell 5G node installed along Route 35 in Lavallette, March 2022. (Photo: Daniel Nee)\" width=\"1000\" height=\"745\" srcset=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553917_DJI_317_jpg_1117186_0_202233154344_photo_original.jpg-1024x763.jpg 1024w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553917_DJI_317_jpg_1117186_0_202233154344_photo_original.jpg-300x225.jpg 300w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553917_DJI_317_jpg_1117186_0_202233154344_photo_original.jpg-240x180.jpg 240w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553917_DJI_317_jpg_1117186_0_202233154344_photo_original.jpg-768x572.jpg 768w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553917_DJI_317_jpg_1117186_0_202233154344_photo_original.jpg-1536x1144.jpg 1536w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553917_DJI_317_jpg_1117186_0_202233154344_photo_original.jpg.jpg 1568w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-10825\" class=\"wp-caption-text\">A small cell 5G node installed along Route 35 in Lavallette, March 2022. (Photo: Daniel Nee)<\/p><\/div>\n<p>Motorists driving southbound on Route 35 in Lavallette this week may have noticed a utility pole that looks different from the others. Capped with a white dome, rough similar in appearance to a radome on the bridge of a ship, the \u201csmall cell\u201d network of \u201cnodes\u201d \u2013 not \u201ctowers\u201d \u2013 is taking shape on the island.<\/p>\n<p>Verizon\u2019s 5G signals are already activated in Seaside Heights and Seaside Park, in some areas, and Shorebeat has measured connection speeds of 1 gb\/s with an iPhone 13. While the deployment of the 5G network will mean a significant boost in both speeds and network capacity on the island \u2013 a major source of frustration for visitors during the busy summer season \u2013 some residents of Lavallette questioned the safety of 5G network infrastructure, leading the borough to consider a legal challenge. Ultimately, the borough council settled on a number of concessions from Verizon.<\/p>\n<div id=\"attachment_10826\" style=\"width: 1010px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553918_DJI_318_jpg_4905129_0_202233154358_photo_original.jpg-scaled.jpg\" data-rel=\"lightbox-image-1\" data-rl_title=\"\" data-rl_caption=\"A small cell 5G node installed along Route 35 in Lavallette, March 2022. (Photo: Daniel Nee)\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-10826\" class=\"size-large wp-image-10826\" src=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553918_DJI_318_jpg_4905129_0_202233154358_photo_original.jpg-1024x766.jpg\" alt=\"A small cell 5G node installed along Route 35 in Lavallette, March 2022. (Photo: Daniel Nee)\" width=\"1000\" height=\"748\" srcset=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553918_DJI_318_jpg_4905129_0_202233154358_photo_original.jpg-1024x766.jpg 1024w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553918_DJI_318_jpg_4905129_0_202233154358_photo_original.jpg-300x225.jpg 300w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553918_DJI_318_jpg_4905129_0_202233154358_photo_original.jpg-240x180.jpg 240w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553918_DJI_318_jpg_4905129_0_202233154358_photo_original.jpg-768x574.jpg 768w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553918_DJI_318_jpg_4905129_0_202233154358_photo_original.jpg-1536x1148.jpg 1536w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553918_DJI_318_jpg_4905129_0_202233154358_photo_original.jpg-2048x1531.jpg 2048w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-10826\" class=\"wp-caption-text\">A small cell 5G node installed along Route 35 in Lavallette, March 2022. (Photo: Daniel Nee)<\/p><\/div>\n<div id=\"attachment_10823\" style=\"width: 1010px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553915_DJI_315_jpg_7586030_0_20223315430_photo_original.jpg-scaled.jpg\" data-rel=\"lightbox-image-2\" data-rl_title=\"\" data-rl_caption=\"A small cell 5G node installed along Route 35 in Lavallette, March 2022. (Photo: Daniel Nee)\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-10823\" class=\"size-large wp-image-10823\" src=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553915_DJI_315_jpg_7586030_0_20223315430_photo_original.jpg-1024x768.jpg\" alt=\"A small cell 5G node installed along Route 35 in Lavallette, March 2022. (Photo: Daniel Nee)\" width=\"1000\" height=\"750\" srcset=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553915_DJI_315_jpg_7586030_0_20223315430_photo_original.jpg-1024x768.jpg 1024w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553915_DJI_315_jpg_7586030_0_20223315430_photo_original.jpg-300x225.jpg 300w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553915_DJI_315_jpg_7586030_0_20223315430_photo_original.jpg-240x180.jpg 240w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553915_DJI_315_jpg_7586030_0_20223315430_photo_original.jpg-768x576.jpg 768w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553915_DJI_315_jpg_7586030_0_20223315430_photo_original.jpg-1536x1152.jpg 1536w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553915_DJI_315_jpg_7586030_0_20223315430_photo_original.jpg-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-10823\" class=\"wp-caption-text\">A small cell 5G node installed along Route 35 in Lavallette, March 2022. (Photo: Daniel Nee)<\/p><\/div>\n<p>Borough Administrator Robert Brice said Verizon installed three of the five node sites that were initially approved in the first round in 2020. These are located at Route 35 North and New York Avenue, Route 35 North and Jersey City Avenue, and Route 35 South and Brown Avenue.<\/p>\n<p>\u201cSome final electrical hookup and inspection have to occur before they are operational, but that will probably be within a few weeks,\u201d Brice said, adding that one site on Washington Avenue was installed and activated in the fall.<\/p>\n<p>There are seven more nodes on the way after the first group are activated.<\/p>\n<div id=\"attachment_10830\" style=\"width: 609px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/IMG_2287.jpg\" data-rel=\"lightbox-image-3\" data-rl_title=\"\" data-rl_caption=\"A speed test app shows 5G ultra-wideband speeds on the island. (Screenshot: Daniel Nee)\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-10830\" class=\"size-large wp-image-10830\" src=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/IMG_2287-599x1024.jpg\" alt=\"A speed test app shows 5G ultra-wideband speeds on the island. (Screenshot: Daniel Nee)\" width=\"599\" height=\"1024\" srcset=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/IMG_2287-599x1024.jpg 599w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/IMG_2287-175x300.jpg 175w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/IMG_2287-768x1313.jpg 768w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/IMG_2287-898x1536.jpg 898w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/IMG_2287.jpg 1170w\" sizes=\"auto, (max-width: 599px) 100vw, 599px\" \/><\/a><p id=\"caption-attachment-10830\" class=\"wp-caption-text\">A speed test app shows 5G ultra-wideband speeds on the island. (Screenshot: Daniel Nee)<\/p><\/div>\n<div id=\"attachment_10826\" style=\"width: 1010px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553918_DJI_318_jpg_4905129_0_202233154358_photo_original.jpg-scaled.jpg\" data-rel=\"lightbox-image-1\" data-rl_title=\"\" data-rl_caption=\"A small cell 5G node installed along Route 35 in Lavallette, March 2022. (Photo: Daniel Nee)\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-10826\" class=\"size-large wp-image-10826\" src=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553918_DJI_318_jpg_4905129_0_202233154358_photo_original.jpg-1024x766.jpg\" alt=\"A small cell 5G node installed along Route 35 in Lavallette, March 2022. (Photo: Daniel Nee)\" width=\"1000\" height=\"748\" srcset=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553918_DJI_318_jpg_4905129_0_202233154358_photo_original.jpg-1024x766.jpg 1024w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553918_DJI_318_jpg_4905129_0_202233154358_photo_original.jpg-300x225.jpg 300w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553918_DJI_318_jpg_4905129_0_202233154358_photo_original.jpg-240x180.jpg 240w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553918_DJI_318_jpg_4905129_0_202233154358_photo_original.jpg-768x574.jpg 768w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553918_DJI_318_jpg_4905129_0_202233154358_photo_original.jpg-1536x1148.jpg 1536w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553918_DJI_318_jpg_4905129_0_202233154358_photo_original.jpg-2048x1531.jpg 2048w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-10826\" class=\"wp-caption-text\">A small cell 5G node installed along Route 35 in Lavallette, March 2022. (Photo: Daniel Nee)<\/p><\/div>\n<p>\u201cThere are no new applications, but they did pick up the construction permits for six of the seven that were approved in the second phase earlier this year,\u201d said Brice. \u201cWe could expect those to be going up sometime in the near future as well.\u201d<\/p>\n<p>The presence of Verizon trucks in Lavallette may not necessarily be related to the 5G deployment, however. Brice said the company is also doing a good deal of fiber installation work in town that will be in support of FiOS internet service, which is planned to be offered borough-wide in the near future. Brice said Verizon has not confirmed a date on which FiOS will be available.<\/p>\n<div class=\"fcbkbttn_buttons_block\" id=\"fcbkbttn_left\"><div class=\"fb-share-button fcbkbttn_large_button \" data-href=\"https:\/\/shorebeat.com\/lavallette-seaside\/2022\/03\/verizon-begins-deploying-its-5g-nodes-in-lavallette\/\" data-type=\"button_count\" data-size=\"large\"><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Motorists driving southbound on Route 35 in Lavallette this week may have noticed a utility pole that looks different from the others. Capped with a white dome, rough similar in appearance to a radome on the bridge of a ship, the \u201csmall cell\u201d network of \u201cnodes\u201d \u2013 not \u201ctowers\u201d \u2013 is taking shape on the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10824,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[2],"tags":[1466,1959,29,965,1598],"class_list":["post-10822","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-lavallette","tag-5g","tag-featured","tag-lavallette-nj-news","tag-small-cell-node","tag-verizon"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2022\/03\/Photo_6553916_DJI_316_jpg_8556413_0_202233154326_photo_original.jpg-scaled.jpg","jetpack_shortlink":"https:\/\/wp.me\/pgsn9q-2Oy","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/posts\/10822","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/comments?post=10822"}],"version-history":[{"count":0,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/posts\/10822\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/media\/10824"}],"wp:attachment":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/media?parent=10822"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/categories?post=10822"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/tags?post=10822"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}