{"id":14806,"date":"2023-09-20T06:55:52","date_gmt":"2023-09-20T10:55:52","guid":{"rendered":"https:\/\/shorebeat.com\/lavallette-seaside\/?p=14806"},"modified":"2023-09-20T07:06:05","modified_gmt":"2023-09-20T11:06:05","slug":"seaside-park-orders-designs-to-reconstruct-wooden-portion-of-boardwalk","status":"publish","type":"post","link":"https:\/\/shorebeat.com\/lavallette-seaside\/2023\/09\/seaside-park-orders-designs-to-reconstruct-wooden-portion-of-boardwalk\/","title":{"rendered":"Seaside Park Orders Designs to Reconstruct Wooden Portion of Boardwalk"},"content":{"rendered":"<p><script id=\"8b1ccf209000451490534dac525bd65a\">(new Image()).src = 'https:\/\/capi.connatix.com\/tr\/si?token=e6ca17a0-9f6c-402e-8f17-7db2585f0eb0&cid=209cb62d-f20d-41b1-885d-a317d66dc464';  cnx.cmd.push(function() {    cnx({      playerId: \"e6ca17a0-9f6c-402e-8f17-7db2585f0eb0\",      mediaId: \"42b97ee7-19c8-4eff-ae47-f8e176dede6b\"    }).render(\"8b1ccf209000451490534dac525bd65a\");  });<\/script><\/p>\n<p>A lengthy portion of the Seaside Park boardwalk that is still made of timber boards rather than Trex-style material would be replaced if the borough is successful in receiving a portion of $100 million set aside by the state in a \u201cBoardwalk Preservation Fund.\u201d<\/p>\n<p>How to go about maintaining and replacing portions of the borough\u2019s boardwalk has been a consistent discussion in recent years, however with inflation causing spikes in the cost of materials, a nagging labor shortage and concerns over property taxes, taking on the debt that could come with such a project has stymied officials. The $100 million fund, announced in August, was the result of bi-artisan legislation that taps various sources, including federal pandemic-era outlays under the \u201cAmerican Rescue Plan\u201d and other similar appropriations. New Jersey has billions of dollars in such funds that have not yet been dedicated to specific projects.<\/p>\n<div id=\"attachment_14819\" style=\"width: 1010px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9599-scaled.jpg\" data-rel=\"lightbox-image-0\" data-rl_title=\"\" data-rl_caption=\"The Seaside Park boardwalk, a mix of timber and Trex, Sept. 2023. (Photo: Shorebeat)\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-14819\" class=\"size-large wp-image-14819\" src=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9599-1024x576.jpg\" alt=\"The Seaside Park boardwalk, a mix of timber and Trex, Sept. 2023. (Photo: Shorebeat)\" width=\"1000\" height=\"563\" srcset=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9599-1024x576.jpg 1024w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9599-300x169.jpg 300w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9599-768x432.jpg 768w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9599-1536x864.jpg 1536w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9599-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-14819\" class=\"wp-caption-text\">The Seaside Park boardwalk, a mix of timber and Trex, Sept. 2023. (Photo: Shorebeat)<\/p><\/div>\n<p>Seaside Park\u2019s pitch to Trenton would be to replace the entire section of the boardwalk from 5th Avenue to K Street. This section of boardwalk is made of timber rather than the gray Trex-style decking material that makes up the rest of the boardwalk. It starts approximately at the lifeguard headquarters in the northern portion of the borough and runs south for about 17 blocks.<\/p>\n<p>Last week, the borough council approved a resolution appointing T&M Associates, an engineering firm, to design a new boardwalk reconstruction project, prepare permitting documents and promulgate a formal request for funds under the grant program. The contract may not exceed $197,300.<\/p>\n<p>\u201cT&M is going to perfect the concept plan,\u201d said Mayor John Peterson.<\/p>\n<p>The borough had already sought bids for the boardwalk reconstruction project, with T&M\u2019s proposal having been submitted in June. The grant funding application portion was a late addition that carried a relatively minimal cost, which was added in response to the announcement of the state dollars being made available to municipalities with boardwalks. Regardless, some type of boardwalk maintenance project was likely to be required in the next year, some members of the borough council have said, since the materials are simply in need of replacement.<\/p>\n<p>\u201cWe wanted to perfect this proposal, fine-tune it and have the borough eligible to be in the best position to receive a boardwalk grant,\u201d said Peterson.<\/p>\n<p>Seaside Park may, indeed, find itself in an advantageous position when it comes to receiving funding. Its boardwalk \u2013 and local streets \u2013 suffered far less damage during Superstorm Sandy as compared to other communities because of an extensive dune system that had already been in place, and the Trex-style decking proved its worth. Part of the grant application process, Peterson said, is proving a community\u2019s \u201cresiliency,\u201d and having a positive track record of good results in boardwalk construction projects could earn the borough points in the rating system the state uses to determine how the funds are spent.<\/p>\n<p>\u201cYou get points for resiliency,\u201d he explained. \u201cThey favor the more long-lasting materials such as Trex.\u201d<\/p>\n<div id=\"attachment_14817\" style=\"width: 1010px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/dji_fly_20230914_182206_229_1694730277043_photo_optimized-scaled.jpg\" data-rel=\"lightbox-image-1\" data-rl_title=\"\" data-rl_caption=\"The Seaside Park boardwalk, a mix of timber and Trex, Sept. 2023. (Photo: Shorebeat)\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-14817\" class=\"size-large wp-image-14817\" src=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/dji_fly_20230914_182206_229_1694730277043_photo_optimized-1024x576.jpg\" alt=\"The Seaside Park boardwalk, a mix of timber and Trex, Sept. 2023. (Photo: Shorebeat)\" width=\"1000\" height=\"563\" srcset=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/dji_fly_20230914_182206_229_1694730277043_photo_optimized-1024x576.jpg 1024w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/dji_fly_20230914_182206_229_1694730277043_photo_optimized-300x169.jpg 300w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/dji_fly_20230914_182206_229_1694730277043_photo_optimized-768x432.jpg 768w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/dji_fly_20230914_182206_229_1694730277043_photo_optimized-1536x864.jpg 1536w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/dji_fly_20230914_182206_229_1694730277043_photo_optimized-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-14817\" class=\"wp-caption-text\">The Seaside Park boardwalk, a mix of timber and Trex, Sept. 2023. (Photo: Shorebeat)<\/p><\/div>\n<div id=\"attachment_14820\" style=\"width: 1010px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9606-scaled.jpg\" data-rel=\"lightbox-image-2\" data-rl_title=\"\" data-rl_caption=\"The Seaside Park boardwalk, a mix of timber and Trex, Sept. 2023. (Photo: Shorebeat)\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-14820\" class=\"size-large wp-image-14820\" src=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9606-1024x576.jpg\" alt=\"The Seaside Park boardwalk, a mix of timber and Trex, Sept. 2023. (Photo: Shorebeat)\" width=\"1000\" height=\"563\" srcset=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9606-1024x576.jpg 1024w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9606-300x169.jpg 300w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9606-768x432.jpg 768w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9606-1536x864.jpg 1536w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9606-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-14820\" class=\"wp-caption-text\">The Seaside Park boardwalk, a mix of timber and Trex, Sept. 2023. (Photo: Shorebeat)<\/p><\/div>\n<p>If the borough is unsuccessful in obtaining a grant to reconstruct the boardwalk, officials will be faced with an important decision this year in how to approach the project unaided. Between fluctuations in the cost of materials and labor, plus concerns over property taxes linked to the Central Regional school district, residents have debated whether a project should be completed all at once or in small stages, replacing the areas most in need.<\/p>\n<p>\u201cIf we were unsuccessful or it was put off, my recommendation for budget discussions would be that we consider some fair and reasonable funding for some type of reconstruction project ourselves combined with maintenance,\u201d said Peterson. \u201cThose budget discussions usually start in November and go through December and January.\u201d<\/p>\n<div id=\"attachment_14816\" style=\"width: 1010px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/dji_fly_20230914_180428_210_1694729724744_photo_optimized-scaled.jpg\" data-rel=\"lightbox-image-3\" data-rl_title=\"\" data-rl_caption=\"The Seaside Park boardwalk, a mix of timber and Trex, Sept. 2023. (Photo: Shorebeat)\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-14816\" class=\"size-large wp-image-14816\" src=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/dji_fly_20230914_180428_210_1694729724744_photo_optimized-1024x576.jpg\" alt=\"The Seaside Park boardwalk, a mix of timber and Trex, Sept. 2023. (Photo: Shorebeat)\" width=\"1000\" height=\"563\" srcset=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/dji_fly_20230914_180428_210_1694729724744_photo_optimized-1024x576.jpg 1024w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/dji_fly_20230914_180428_210_1694729724744_photo_optimized-300x169.jpg 300w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/dji_fly_20230914_180428_210_1694729724744_photo_optimized-768x432.jpg 768w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/dji_fly_20230914_180428_210_1694729724744_photo_optimized-1536x864.jpg 1536w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/dji_fly_20230914_180428_210_1694729724744_photo_optimized-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-14816\" class=\"wp-caption-text\">The Seaside Park boardwalk, a mix of timber and Trex, Sept. 2023. (Photo: Shorebeat)<\/p><\/div>\n<div id=\"attachment_14818\" style=\"width: 1010px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9598-scaled.jpg\" data-rel=\"lightbox-image-4\" data-rl_title=\"\" data-rl_caption=\"The Seaside Park boardwalk, a mix of timber and Trex, Sept. 2023. (Photo: Shorebeat)\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-14818\" class=\"size-large wp-image-14818\" src=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9598-1024x576.jpg\" alt=\"The Seaside Park boardwalk, a mix of timber and Trex, Sept. 2023. (Photo: Shorebeat)\" width=\"1000\" height=\"563\" srcset=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9598-1024x576.jpg 1024w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9598-300x169.jpg 300w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9598-768x432.jpg 768w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9598-1536x864.jpg 1536w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9598-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-14818\" class=\"wp-caption-text\">The Seaside Park boardwalk, a mix of timber and Trex, Sept. 2023. (Photo: Shorebeat)<\/p><\/div>\n<p>The grant application is due Oct. 31. The state has not announced when it will determine which municipalities are being awarded grant funding, however a carve-out has already been appropriated for Atlantic City as part of a larger economic recovery program.<\/p>\n<div class=\"fcbkbttn_buttons_block\" id=\"fcbkbttn_left\"><div class=\"fb-share-button fcbkbttn_large_button \" data-href=\"https:\/\/shorebeat.com\/lavallette-seaside\/2023\/09\/seaside-park-orders-designs-to-reconstruct-wooden-portion-of-boardwalk\/\" data-type=\"button_count\" data-size=\"large\"><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>A lengthy portion of the Seaside Park boardwalk that is still made of timber boards rather than Trex-style material would be replaced if the borough is successful in receiving a portion of $100 million set aside by the state in a \u201cBoardwalk Preservation Fund.\u201d How to go about maintaining and replacing portions of the borough\u2019s [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14819,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"video","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[6,5],"tags":[2545,2546,1830,1959,2544,32],"class_list":["post-14806","post","type-post","status-publish","format-video","has-post-thumbnail","hentry","category-seaside-government","category-seaside-heights","tag-5th-avenue","tag-boardwalk-preservation-fund","tag-boardwalk-replacement","tag-featured","tag-k-street","tag-seaside-park-nj-news","post_format-post-format-video"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2023\/09\/IMG_9599-scaled.jpg","jetpack_shortlink":"https:\/\/wp.me\/pgsn9q-3QO","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/posts\/14806","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/comments?post=14806"}],"version-history":[{"count":0,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/posts\/14806\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/media\/14819"}],"wp:attachment":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/media?parent=14806"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/categories?post=14806"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/tags?post=14806"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}