{"id":2866,"date":"2016-09-12T01:29:00","date_gmt":"2016-09-12T05:29:00","guid":{"rendered":"https:\/\/shorebeat.com\/lavallette-seaside\/?p=2866"},"modified":"2016-09-12T01:29:00","modified_gmt":"2016-09-12T05:29:00","slug":"construction-of-protective-beach-berm-begins-in-seaside-heights","status":"publish","type":"post","link":"https:\/\/shorebeat.com\/lavallette-seaside\/2016\/09\/construction-of-protective-beach-berm-begins-in-seaside-heights\/","title":{"rendered":"Construction of Protective Beach Berm Begins in Seaside Heights"},"content":{"rendered":"<div id=\"attachment_2867\" style=\"width: 628px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5788.jpg\" data-rel=\"lightbox-image-0\" data-rl_title=\"\" data-rl_caption=\"A temporary protective berm being constructed in Seaside Heights, Sept. 2016. (Photo: Daniel Nee)\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-2867\" class=\"size-large wp-image-2867\" src=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5788-1024x768.jpg\" alt=\"A temporary protective berm being constructed in Seaside Heights, Sept. 2016. (Photo: Daniel Nee)\" width=\"618\" height=\"464\" srcset=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5788-1024x768.jpg 1024w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5788-240x180.jpg 240w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5788-300x225.jpg 300w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5788-768x576.jpg 768w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5788-600x450.jpg 600w\" sizes=\"auto, (max-width: 618px) 100vw, 618px\" \/><\/a><p id=\"caption-attachment-2867\" class=\"wp-caption-text\">A temporary protective berm being constructed in Seaside Heights, Sept. 2016. (Photo: Daniel Nee)<\/p><\/div>\n<p>Crews have started constructing a beach berm that will help protect the Seaside Heights boardwalk and beachfront as nor&#8217;easter season approaches.<\/p>\n<p>Sand has been delivered to the borough&#8217;s north beach at Hiering Avenue, and workers using bulldozers and front loaders have been distributing the sand and building the berm along the oceanfront in the northern half of the town, where dunes were washed away last winter.<\/p>\n<div id=\"attachment_2868\" style=\"width: 628px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5790.jpg\" data-rel=\"lightbox-image-1\" data-rl_title=\"\" data-rl_caption=\"A temporary protective berm being constructed in Seaside Heights, Sept. 2016. (Photo: Daniel Nee)\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-2868\" class=\"size-large wp-image-2868\" src=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5790-1024x768.jpg\" alt=\"A temporary protective berm being constructed in Seaside Heights, Sept. 2016. (Photo: Daniel Nee)\" width=\"618\" height=\"464\" srcset=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5790-1024x768.jpg 1024w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5790-240x180.jpg 240w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5790-300x225.jpg 300w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5790-768x576.jpg 768w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5790-600x450.jpg 600w\" sizes=\"auto, (max-width: 618px) 100vw, 618px\" \/><\/a><p id=\"caption-attachment-2868\" class=\"wp-caption-text\">A temporary protective berm being constructed in Seaside Heights, Sept. 2016. (Photo: Daniel Nee)<\/p><\/div>\n<div id=\"attachment_2869\" style=\"width: 628px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5792.jpg\" data-rel=\"lightbox-image-2\" data-rl_title=\"\" data-rl_caption=\"A temporary protective berm being constructed in Seaside Heights, Sept. 2016. (Photo: Daniel Nee)\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-2869\" class=\"size-large wp-image-2869\" src=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5792-1024x768.jpg\" alt=\"A temporary protective berm being constructed in Seaside Heights, Sept. 2016. (Photo: Daniel Nee)\" width=\"618\" height=\"464\" srcset=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5792-1024x768.jpg 1024w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5792-240x180.jpg 240w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5792-300x225.jpg 300w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5792-768x576.jpg 768w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5792-600x450.jpg 600w\" sizes=\"auto, (max-width: 618px) 100vw, 618px\" \/><\/a><p id=\"caption-attachment-2869\" class=\"wp-caption-text\">A temporary protective berm being constructed in Seaside Heights, Sept. 2016. (Photo: Daniel Nee)<\/p><\/div>\n<p>&#8220;Hopefully we won\u2019t have any more storms, but we\u2019re putting it up for protection,&#8221; said Mayor Anthony Vaz.<\/p>\n<p>The borough received $585,000 from the state to build the berm while officials wait for a federal beach replenishment project to begin. That project will construct permanent dunes, 22 feet above grade, with at least 200 feet of sand in front of them. Bids are expected to be solicited by the U.S. Army Corps of Engineers later this month.<\/p>\n<div id=\"attachment_2870\" style=\"width: 628px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5793.jpg\" data-rel=\"lightbox-image-3\" data-rl_title=\"\" data-rl_caption=\"A temporary protective berm being constructed in Seaside Heights, Sept. 2016. (Photo: Daniel Nee)\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-2870\" class=\"size-large wp-image-2870\" src=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5793-1024x768.jpg\" alt=\"A temporary protective berm being constructed in Seaside Heights, Sept. 2016. (Photo: Daniel Nee)\" width=\"618\" height=\"464\" srcset=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5793-1024x768.jpg 1024w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5793-240x180.jpg 240w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5793-300x225.jpg 300w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5793-768x576.jpg 768w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5793-600x450.jpg 600w\" sizes=\"auto, (max-width: 618px) 100vw, 618px\" \/><\/a><p id=\"caption-attachment-2870\" class=\"wp-caption-text\">A temporary protective berm being constructed in Seaside Heights, Sept. 2016. (Photo: Daniel Nee)<\/p><\/div>\n<p>Vaz said about 600 dump truck-loads of sand are being delivered as part of\u00a0the current project.<\/p>\n<div class=\"fcbkbttn_buttons_block\" id=\"fcbkbttn_left\"><div class=\"fb-share-button fcbkbttn_large_button \" data-href=\"https:\/\/shorebeat.com\/lavallette-seaside\/2016\/09\/construction-of-protective-beach-berm-begins-in-seaside-heights\/\" data-type=\"button_count\" data-size=\"large\"><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Crews have started constructing a beach berm that will help protect the Seaside Heights boardwalk and beachfront as nor&#8217;easter season approaches. Sand has been delivered to the borough&#8217;s north beach at Hiering Avenue, and workers using bulldozers and front loaders have been distributing the sand and building the berm along the oceanfront in the northern [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2867,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[18,6,5],"tags":[37,331,169,20],"class_list":["post-2866","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-seaside-government","category-seaside-heights","tag-beach-replenishment","tag-berm","tag-dunes","tag-seaside-heights-nj-news"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/IMG_5788.jpg","jetpack_shortlink":"https:\/\/wp.me\/pgsn9q-Ke","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/posts\/2866","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/comments?post=2866"}],"version-history":[{"count":0,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/posts\/2866\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/media\/2867"}],"wp:attachment":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/media?parent=2866"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/categories?post=2866"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/tags?post=2866"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}