{"id":5268,"date":"2018-06-13T01:37:06","date_gmt":"2018-06-13T05:37:06","guid":{"rendered":"https:\/\/shorebeat.com\/lavallette-seaside\/?p=5268"},"modified":"2018-06-13T01:37:32","modified_gmt":"2018-06-13T05:37:32","slug":"county-commits-to-repaving-portions-of-central-and-porter-avenues","status":"publish","type":"post","link":"https:\/\/shorebeat.com\/lavallette-seaside\/2018\/06\/county-commits-to-repaving-portions-of-central-and-porter-avenues\/","title":{"rendered":"Central, Porter Avenues in Seaside Heights Will be Repaved"},"content":{"rendered":"<div id=\"attachment_1793\" style=\"width: 610px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/05\/seaside_heights_central_ave.jpg\" data-rel=\"lightbox-image-0\" data-rl_title=\"\" data-rl_caption=\"Central Avenue, Seaside Heights. (Photo: Daniel Nee)\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-1793\" class=\"size-full wp-image-1793\" src=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/05\/seaside_heights_central_ave.jpg\" alt=\"Central Avenue, Seaside Heights. (Photo: Daniel Nee)\" width=\"600\" height=\"399\" srcset=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/05\/seaside_heights_central_ave.jpg 600w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/05\/seaside_heights_central_ave-300x200.jpg 300w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/05\/seaside_heights_central_ave-310x205.jpg 310w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><p id=\"caption-attachment-1793\" class=\"wp-caption-text\">Central Avenue, Seaside Heights. (Photo: Daniel Nee)<\/p><\/div>\n<p><span style=\"font-weight: 400;\">Portions of Central Avenue and Porter Avenue will be repaved before Spring 2019, in a county project now in the design phase.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Ocean County has added two resurfacing and reconstruction projects to its schedule: Central Avenue from Porter to Heiring avenues, and Porter between Bay Boulevard and Ocean.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Ocean County Engineer John Ernst said the timeline for the project is now in the design phase, and then the county will go out to bid shortly thereafter, possibly starting the repaving and reconstruction either fall or spring.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cIt will either be repaved in the fall 2018 or spring 2019 depending on the timing,\u201d Ernst said.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Central Avenue, also known as county Route 47, \u00a0sits in Seaside Heights, and Mayor Anthony Vaz said the borough has long been advocating for the inclusion of the roads on the county\u2019s road projects list.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">When the 2018 project list was approved by the county freeholders earlier this spring, it was a sigh of relief, said Vaz.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cWe\u2019ve pushed for this for some time and I am glad to see the county has committed to these road improvements in Seaside Heights,\u201d said the mayor.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Vaz said this main corridor project, coupled with the development designation for the former Merge and steel properties in Seaside Heights will contribute dramatically to improving the borough for residents and visitors, but also businesses.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cThese components are pieces that need to come together for the overall betterment of Seaside Heights,\u201d Vaz said earlier this year after the freeholder\u2019s approval of the roads projects.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Ernst said these roads are the only ones on the barrier island that are on the 2018 project list.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The Central Avenue project is approximately one mile long, stretching nearly the length of Seaside Heights.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Porter Avenue, also known as county Route 79, runs alongside the Route 35 shift from its on and off ramps with Route 37, at the border between Seaside Heights and Seaside Park. The length of that project is less than a half mile.<\/span><\/p>\n<p>The two barrier island road projects were part of the larger list of annual road projects named by the freeholders as part of its $3 million ordinance this spring.<\/p>\n<div class=\"fcbkbttn_buttons_block\" id=\"fcbkbttn_left\"><div class=\"fb-share-button fcbkbttn_large_button \" data-href=\"https:\/\/shorebeat.com\/lavallette-seaside\/2018\/06\/county-commits-to-repaving-portions-of-central-and-porter-avenues\/\" data-type=\"button_count\" data-size=\"large\"><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Portions of Central Avenue and Porter Avenue will be repaved before Spring 2019, in a county project now in the design phase. Ocean County has added two resurfacing and reconstruction projects to its schedule: Central Avenue from Porter to Heiring avenues, and Porter between Bay Boulevard and Ocean. Ocean County Engineer John Ernst said the [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":1793,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[18,15,5],"tags":[501,124,20],"class_list":["post-5268","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-ocean-county","category-seaside-heights","tag-central-avenue","tag-paving","tag-seaside-heights-nj-news"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/05\/seaside_heights_central_ave.jpg","jetpack_shortlink":"https:\/\/wp.me\/pgsn9q-1mY","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/posts\/5268","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/comments?post=5268"}],"version-history":[{"count":0,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/posts\/5268\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/media\/1793"}],"wp:attachment":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/media?parent=5268"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/categories?post=5268"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/tags?post=5268"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}