{"id":5768,"date":"2018-10-02T02:48:54","date_gmt":"2018-10-02T06:48:54","guid":{"rendered":"https:\/\/shorebeat.com\/lavallette-seaside\/?p=5768"},"modified":"2018-10-02T02:49:09","modified_gmt":"2018-10-02T06:49:09","slug":"in-prime-replenishment-season-all-is-temporarily-quiet-on-the-island","status":"publish","type":"post","link":"https:\/\/shorebeat.com\/lavallette-seaside\/2018\/10\/in-prime-replenishment-season-all-is-temporarily-quiet-on-the-island\/","title":{"rendered":"In Prime Beach Replenishment Season, All is Temporarily Quiet on the Island"},"content":{"rendered":"<div id=\"attachment_5769\" style=\"width: 650px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2018\/10\/ortley_nonact14.jpg\" data-rel=\"lightbox-image-0\" data-rl_title=\"\" data-rl_caption=\"A desolate Ortley Beach, Oct. 1, 2018. (Photo: Daniel Nee)\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-5769\" class=\"size-large wp-image-5769\" src=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2018\/10\/ortley_nonact14-1024x683.jpg\" alt=\"A desolate Ortley Beach, Oct. 1, 2018. (Photo: Daniel Nee)\" width=\"640\" height=\"427\" srcset=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2018\/10\/ortley_nonact14-1024x683.jpg 1024w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2018\/10\/ortley_nonact14-300x200.jpg 300w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2018\/10\/ortley_nonact14-768x512.jpg 768w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2018\/10\/ortley_nonact14-630x420.jpg 630w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2018\/10\/ortley_nonact14-640x427.jpg 640w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2018\/10\/ortley_nonact14-681x454.jpg 681w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><p id=\"caption-attachment-5769\" class=\"wp-caption-text\">A desolate Ortley Beach, Oct. 1, 2018. (Photo: Daniel Nee)<\/p><\/div>\n<p>The summer tourists have departed and there&#8217;s plenty of room on the beach. But the heavy equipment that was expected to be plugging away at a massive beach replenishment project is sitting, for the most part, idle.<\/p>\n<p>A series of storms and days of heavy surf, as well as an incident last month in which a pipe burst under the pressure of sand being pumped to shore \u2013 injuring workers \u2013 has taken its toll on the project&#8217;s progress. Pressing needs in other locations have also stalled the project on Ocean County&#8217;s northern barrier island. The first day of this week began without any sand being pumped to shore.<\/p>\n<p>According to the U.S. Army Corps of Engineers&#8217; Philadelphia district, there are three replenishment and dune-building projects on the island that are underway simultaneously. The first, in Mantoloking, is expected to restart Tuesday. The dredge boats assigned to that project, the <em>Magdalen<\/em> and <em>RN Weeks<\/em>, have been in Long Beach Island working on a replenishment project in Harvey Cedars, but recently completed that work.<\/p>\n<p>The Seaside Park portion of the project, which was hampered by repairs required after the pipe burst as well as foul weather, is also now the victim of a busy dredging schedule. The boat responsible for replenishing Seaside Park&#8217;s beaches, the <em>CR McCaskill<\/em>, is &#8220;finishing another job in NY, expected to resume beachfill operations around mid-October,&#8221; the Corps said in an announcement.<\/p>\n<p>In Ortley Beach, where the most sought-after project has been about half-completed, has its dredge boat, the <em>EW Ellefsen<\/em>, on site. Pumping was not taking place on Monday due to large ocean swells, but it will resume as soon as conditions permit, the Corps says.<\/p>\n<p>Meanwhile, Lavallette officials are still expecting the overall project to move forward at a pace rapid enough to guarantee the beaches will be replenished, the dunes will be built and entrances will be in place by the spring. Mayor Walter LaCicero said at a council meeting Monday night that representatives from the Corps told him to expect work to begin in the borough in November or December, with operations continuing into February or March.<\/p>\n<p>The borough, he said, is also looking into new options for benches along the oceanfront and may work with the town&#8217;s Beautification Committee on a memorial sponsor program.<\/p>\n<div class=\"fcbkbttn_buttons_block\" id=\"fcbkbttn_left\"><div class=\"fb-share-button fcbkbttn_large_button \" data-href=\"https:\/\/shorebeat.com\/lavallette-seaside\/2018\/10\/in-prime-replenishment-season-all-is-temporarily-quiet-on-the-island\/\" data-type=\"button_count\" data-size=\"large\"><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>The summer tourists have departed and there&#8217;s plenty of room on the beach. But the heavy equipment that was expected to be plugging away at a massive beach replenishment project is sitting, for the most part, idle. A series of storms and days of heavy surf, as well as an incident last month in which [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5769,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[18,2,92,5],"tags":[37,29,19,32,902],"class_list":["post-5768","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-lavallette","category-ortley-beach","category-seaside-heights","tag-beach-replenishment","tag-lavallette-nj-news","tag-ortley-beach-nj-news","tag-seaside-park-nj-news","tag-u-s-army-corps-of-engineers"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2018\/10\/ortley_nonact14.jpg","jetpack_shortlink":"https:\/\/wp.me\/pgsn9q-1v2","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/posts\/5768","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/comments?post=5768"}],"version-history":[{"count":0,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/posts\/5768\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/media\/5769"}],"wp:attachment":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/media?parent=5768"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/categories?post=5768"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/tags?post=5768"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}