{"id":8111,"date":"2020-09-11T02:49:22","date_gmt":"2020-09-11T06:49:22","guid":{"rendered":"https:\/\/shorebeat.com\/lavallette-seaside\/?p=8111"},"modified":"2020-09-11T02:49:22","modified_gmt":"2020-09-11T06:49:22","slug":"seaside-park-street-to-be-reconstructed","status":"publish","type":"post","link":"https:\/\/shorebeat.com\/lavallette-seaside\/2020\/09\/seaside-park-street-to-be-reconstructed\/","title":{"rendered":"Seaside Park Street to be Reconstructed"},"content":{"rendered":"<div id=\"attachment_3001\" style=\"width: 650px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/seaside_park_water_tower.jpg\" data-rel=\"lightbox-image-0\" data-rl_title=\"\" data-rl_caption=\"Seaside Park water tower. (Photo: Daniel Nee)\" title=\"\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-3001\" class=\"size-large wp-image-3001\" src=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/seaside_park_water_tower-1024x681.jpg\" alt=\"Seaside Park water tower. (Photo: Daniel Nee)\" width=\"640\" height=\"426\" srcset=\"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/seaside_park_water_tower-1024x681.jpg 1024w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/seaside_park_water_tower-300x199.jpg 300w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/seaside_park_water_tower-768x511.jpg 768w, https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/seaside_park_water_tower-310x205.jpg 310w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><p id=\"caption-attachment-3001\" class=\"wp-caption-text\">Seaside Park water tower. (Photo: Daniel Nee)<\/p><\/div>\n<p>The Seaside Park borough council on Thursday night approved the entire reconstruction of a street in town.<\/p>\n<p>The council voted to borrow $350,000 for the reconstruction of M Street. The project will include removing the current blacktop and replacing it with a new base and paving surface, as well as drainage and other improvements.<\/p>\n<p>The bond measure to support the project was approved unanimously. Now that the funding has been appropriated, the borough must seek bids, award and contract and hold pre-construction meetings to determine when the work will be completed.<\/p>\n<div class=\"fcbkbttn_buttons_block\" id=\"fcbkbttn_left\"><div class=\"fb-share-button fcbkbttn_large_button \" data-href=\"https:\/\/shorebeat.com\/lavallette-seaside\/2020\/09\/seaside-park-street-to-be-reconstructed\/\" data-type=\"button_count\" data-size=\"large\"><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>The Seaside Park borough council on Thursday night approved the entire reconstruction of a street in town. The council voted to borrow $350,000 for the reconstruction of M Street. The project will include removing the current blacktop and replacing it with a new base and paving surface, as well as drainage and other improvements. The [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3001,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[18,6,5],"tags":[1785,32],"class_list":["post-8111","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-seaside-government","category-seaside-heights","tag-m-street","tag-seaside-park-nj-news"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-content\/uploads\/2016\/09\/seaside_park_water_tower.jpg","jetpack_shortlink":"https:\/\/wp.me\/pgsn9q-26P","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/posts\/8111","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/comments?post=8111"}],"version-history":[{"count":0,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/posts\/8111\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/media\/3001"}],"wp:attachment":[{"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/media?parent=8111"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/categories?post=8111"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shorebeat.com\/lavallette-seaside\/wp-json\/wp\/v2\/tags?post=8111"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}