{"id":1909,"date":"2018-04-23T01:48:36","date_gmt":"2018-04-23T05:48:36","guid":{"rendered":"https:\/\/shorebeat.com\/tomsriver\/?p=1909"},"modified":"2018-04-23T01:48:36","modified_gmt":"2018-04-23T05:48:36","slug":"auto-repair-sales-facility-proposed-for-route-9-in-toms-river","status":"publish","type":"post","link":"https:\/\/shorebeat.com\/tomsriver\/2018\/04\/auto-repair-sales-facility-proposed-for-route-9-in-toms-river\/","title":{"rendered":"Auto Repair, Sales Facility Proposed for Route 9 in Toms River"},"content":{"rendered":"<div id=\"attachment_1910\" style=\"width: 788px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-1910\" class=\"size-full wp-image-1910\" src=\"https:\/\/shorebeat.com\/tomsriver\/wp-content\/uploads\/2018\/04\/Screen-Shot-2018-04-23-at-1.47.04-AM.png\" alt=\"2 Froriep Lane (Credit: Google Maps)\" width=\"778\" height=\"545\" srcset=\"https:\/\/shorebeat.com\/tomsriver\/wp-content\/uploads\/2018\/04\/Screen-Shot-2018-04-23-at-1.47.04-AM.png 778w, https:\/\/shorebeat.com\/tomsriver\/wp-content\/uploads\/2018\/04\/Screen-Shot-2018-04-23-at-1.47.04-AM-300x210.png 300w, https:\/\/shorebeat.com\/tomsriver\/wp-content\/uploads\/2018\/04\/Screen-Shot-2018-04-23-at-1.47.04-AM-768x538.png 768w, https:\/\/shorebeat.com\/tomsriver\/wp-content\/uploads\/2018\/04\/Screen-Shot-2018-04-23-at-1.47.04-AM-600x420.png 600w, https:\/\/shorebeat.com\/tomsriver\/wp-content\/uploads\/2018\/04\/Screen-Shot-2018-04-23-at-1.47.04-AM-640x448.png 640w, https:\/\/shorebeat.com\/tomsriver\/wp-content\/uploads\/2018\/04\/Screen-Shot-2018-04-23-at-1.47.04-AM-681x477.png 681w\" sizes=\"auto, (max-width: 778px) 100vw, 778px\" \/><p id=\"caption-attachment-1910\" class=\"wp-caption-text\">2 Froriep Lane (Credit: Google Maps)<\/p><\/div>\n<p>A local company has submitted an application to the township\u2019s planning board, seeking permission to build a 4,000 square foot vehicle repair garage and an adjacent office that will be used as a \u201cvehicle repair and sales facility.\u201d<\/p>\n<p>The proposed plan by Fischer Auto Body includes a 4,000 square foot garage that would be constructed at 2 Froriep Lane, at the corner of Route 9,\u00a0and the conversion of an existing single family residence into office space.<\/p>\n<p>The proposed site is in the Highway Business Zone, so use variances are required, however the business is seeking a slew of more routine \u201cbulk\u201d variances \u2013 mostly setbacks of only a few feet outside of what the township\u2019s building code permits. The facility would also include a\u00a06-foot high block wall within a portion of the front yard setback along Route 9. The facility will include\u00a0screened refuse areas and a\u00a0trash enclosure to store scrap metal within the front yard along Route 9.<\/p>\n<p>A hearing on the application will be heard at the board\u2019s May 2 meeting, which begins at 6 p.m. at the municipal complex.<\/p>\n<div class=\"fcbkbttn_buttons_block\" id=\"fcbkbttn_left\"><div class=\"fb-share-button fcbkbttn_large_button \" data-href=\"https:\/\/shorebeat.com\/tomsriver\/2018\/04\/auto-repair-sales-facility-proposed-for-route-9-in-toms-river\/\" data-type=\"button_count\" data-size=\"large\"><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>A local company has submitted an application to the township\u2019s planning board, seeking permission to build a 4,000 square foot vehicle repair garage and an adjacent office that will be used as a \u201cvehicle repair and sales facility.\u201d The proposed plan by Fischer Auto Body includes a 4,000 square foot garage that would be constructed [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1910,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9,3],"tags":[605,606,11],"class_list":["post-1909","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-government","tag-2-froriep-lane","tag-fischer-auto-body","tag-toms-river-nj-news"],"jetpack_featured_media_url":"https:\/\/shorebeat.com\/tomsriver\/wp-content\/uploads\/2018\/04\/Screen-Shot-2018-04-23-at-1.47.04-AM.png","_links":{"self":[{"href":"https:\/\/shorebeat.com\/tomsriver\/wp-json\/wp\/v2\/posts\/1909","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shorebeat.com\/tomsriver\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shorebeat.com\/tomsriver\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/tomsriver\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/tomsriver\/wp-json\/wp\/v2\/comments?post=1909"}],"version-history":[{"count":0,"href":"https:\/\/shorebeat.com\/tomsriver\/wp-json\/wp\/v2\/posts\/1909\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shorebeat.com\/tomsriver\/wp-json\/wp\/v2\/media\/1910"}],"wp:attachment":[{"href":"https:\/\/shorebeat.com\/tomsriver\/wp-json\/wp\/v2\/media?parent=1909"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shorebeat.com\/tomsriver\/wp-json\/wp\/v2\/categories?post=1909"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shorebeat.com\/tomsriver\/wp-json\/wp\/v2\/tags?post=1909"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}